So I'll start a thread about my railroad. I am building it up in 2 phases, I am currently done with the benchwork and homasote for phase 1, and I'm now wiring 120 under the layout with outlets every 12'. I am putting OSB boards in the middle under the layout peninsula to hold the wiring for lights, switches, signals, animation, etc.
I still need to determine what I'm going to use for layout lighting. I bought 20 edge lit LED fixtures directly from China, got them about 3 weeks later, cut a hole in the dropped ceiling panel and mounted one of the lights, wired it up, flipped the switch, and nothing. Trouble shooting it I determined that there was power going into the transformer, but nothing coming out. So I tested each of the other 19 and found that 8 worked, 2 flashed like disco lights, and the rest did absolutely nothing. A 60% failure rate quickly put the brakes on that plan.
I intend to get the track laid, some scenery done and maybe even have a couple of operating sessions, then start on phase 2. I have a 30x62' basement, and have finished most of the work in the one half. But I have finished the insulation, drywall, 2 walls, a bathroom and some other work on the other side.
I lost 3 months this summer and fall after having a 5 bypass heart operation that slowed me down for a while. But I'm back with a vengeance now.
I'll post more later, after my nap.