General > General Discussion
Layout control panels
G8B4Life:
Has it really been 7 months? wow. I guess it's a good thing you enjoy the electronics side on par with the rest of hobby. So many people would be close to madness if it took them that long to build their control panels. Mind you, you did virtually 2 per month which is not bad going.
What comes after control panels, besides installing them?
- Tim
Alan:
--- Quote ---What comes after control panels, besides installing them?
--- End quote ---
* locate panels, drill attach holes
* trim fascia for connector clearance
* tape, mud, paint fascia
* install panels
* connector plugs on module harnesses
* find and fix all my mistakes :'(
Alan:
--- Quote from: G8B4Life on June 16, 2017, 08:43:53 PM ---What comes after control panels, besides installing them?
- Tim
--- End quote ---
Since you asked 2-1/2 years ago ;D, this is what comes next. Lots more pics on the LK&O site: http://www.lkorailroad.com/fascia-finished/
G8B4Life:
Looking good Alan,
Congratulations on the upcoming retirement. More LK&O time! Looking forward it.
- Tim
Alan:
It's alive! It's alive!
First two control panels are wired and working.
Gory details: http://www.lkorailroad.com/panel-wiring-part-i/
Navigation
[0] Message Index
[#] Next page
[*] Previous page
Go to full version