General > General Discussion
Slow
nodcc4me:
Nice work! One chip beats none. 😜
Alan:
Thanks. I have several more steps to go.
* Build a panel cutoff storage bin
* Build an island bench for miter saw, grinder, drill presses
* Plumb and install central vac
* Super clean and organize
That will complete the workshop build-out. I actually started the workshop build in 2010 but got sidetracked by, you guessed it, trains!
Here is the blog post where I originally planned the basement space in preparation for trains and a workshop: http://www.lkorailroad.com/basement-floor-plan-revised/ It was pretty cool starting with what felt like a giant wide open basement. Today it feels small.
nodcc4me:
That will be quite a workshop and basement.. What software did you draw it up with?
Alan:
Illustrator
nodcc4me:
Thanks.
Navigation
[0] Message Index
[#] Next page
[*] Previous page
Go to full version