RailPro > Finished RailPro Installation Examples

Walthers HO SW-1 install

<< < (3/3)

BruceRogers:




I haven't looked inside the Walthers SW1, but this is a Kato NW2 I did about 3 years ago. It has no sound but it gives an idea how much milling I had to do to the split frame. I even had to trim the inside of the shell near the hood sides with a rotary cutter a bit even after all this to get the shell to fit down without forcing it on.

Carter:
File down the lead weight, I did a 70 Ton switcher the same way. It worked maintaining the original control board cause it held the front/rear headlights in place. Also I used a short section of drinking straws and stuffed the extra wires inside for neatness.

Navigation

[0] Message Index

[*] Previous page

Go to full version