RailPro > RailPro Specific Help & Discussion
Track layout advice
(1/1)
Cal Trask:
Will this layout work? Or do I need another AR-1 at Switch 3?
Alan:
Sure.
If more than one train will be operating then make sure there is a fair amount of track between switches 1 & 2 and 3 & 4. Weird things might happen if trains bridge two different AR-1 boundaries.
Navigation
[0] Message Index
Go to full version