General > General Discussion

Helix with location sensing

(1/3) > >>

Alan:
My helix is finally finished. Gets installed on the layout today. If you are interested in the details there are a series of posts on the LKO blog.

Building the helix starts here: http://www.lkorailroad.com/south-helix-part-i/

Building the location detector system starts here: http://www.lkorailroad.com/helix-sense-part-i/



Train location sensors:

G8B4Life:
The helix only took a year, and given how long the layout has been in construction I don't have any worries of you tiring of model railroading. Impressive engineering and electrical as usual.

- Tim

William Brillinger:

--- Quote ---Impressive engineering and electrical as usual.
--- End quote ---

I'll second that!!

Alan:

--- Quote from: G8B4Life on March 26, 2022, 10:09:49 AM ---The helix only took a year, and given how long the layout has been in construction I don't have any worries of you tiring of model railroading. Impressive engineering and electrical as usual.

- Tim

--- End quote ---

Layout construction is what I enjoy most about the hobby. I operate the layout on occasion but don't get the thrill I get from building it. If all goes to plan my layout will never be finished. That would kill the fun.

Espeelark:
Alan - have been following your LK&O blog for quite some time!
You have given me some pointers/ideas along the way as I build my multi-deck SP Lordsburg Sub.
https://forum.mrhmag.com/post/sp-lordsburg-sub-construction-12214626?&trail=200
Thank you!

Navigation

[0] Message Index

[#] Next page

Go to full version