Author Topic: 5 engine install/break in  (Read 10023 times)

Dean

  • Conductor
  • ****
  • Posts: 211
5 engine install/break in
« on: February 05, 2018, 03:43:20 PM »


A five engine consist of weighted cars. I have noticed a drop in stall speed current after about an hour of running. I think it might be prudent to rerun the stall speed current test after new engines have been run for awhile.

( hope the picture shows up )
Dean

Alan

  • Conductor
  • ****
  • Posts: 1073
    • LK&O Railroad
Alan

LK&O Railroad website

When I was a kid... no wait, I still do that. HO, 28x32, double deck, 1969, RailPro