Hey all,
I have tried multiple times to transfer the GE Gevo Tier 4 prime mover file to my ET44 and it fails every time. It seems like its tranferring for quite a while, so I just leave it, and when I come back it has the error. I even removed the other prime mover sound too to make sure there was plenty of space and still no success. It's the first LM 3s 21 I've used. Using it with a decoder buddy V5B in a Scaletrain ET44AH. The program rev is the 1.03 which is the latest I see in Railpro assistant. I guess I'll try the other GE prime mover and see if that works.
Oh, and I tried this on the layout using the new HC-3 ( with latest firmware), and also at the desk with the HC-2 Simulater with latest version 2.53
Another odd piece to this. After the error has happened, I can't try to load anything again without cycling power to the loco or it will give me an error that it's not responding to RF signal. ALmost like it has gone to sleep. After I cycle power, it's fine.
Any thoughts?