Author Topic: Transferring custom projects between HC’s  (Read 467 times)

Jim Agnew

  • Fireman
  • **
  • Posts: 31
Transferring custom projects between HC’s
« on: April 16, 2025, 05:36:29 PM »
Is there a way to transfer a custom project from an HC2 to an HC3?

G8B4Life

  • Signalman (Global Mod)
  • Conductor
  • *****
  • Posts: 1276
  • I'll think of a catchy tag line one day
Re: Transferring custom projects between HC’s
« Reply #1 on: April 18, 2025, 12:39:08 AM »
What do you mean by project? No there isn't any way to transfer things between HC's, and except for syncing HC's to have the save locomotives etc loaded into them instead of having to detect each loco separately when you buy a new HC (which would be a cool feature) there shouldn't be a need to transfer things between HC's.

- Tim

JRad

  • Conductor
  • ****
  • Posts: 139
Re: Transferring custom projects between HC’s
« Reply #2 on: April 18, 2025, 08:21:42 AM »
Is there a way to transfer a custom project from an HC2 to an HC3?

Hi Jim -  The only way I know of is via RailPro Assistant. Hopefully you still have the project in RPA whee you created it. Simply load it again to the second HC and so on.

File handling has never been a RailPro strong point.  As a very old-school programmer, I've been frustrated by the inability to export or print the project code for debugging. Best I could manage was screen shots.

I'm curious as to what your project is?  I have two currently in use. One for lights and sound in a cabooses and another to drive servos that control remote turnouts.